BLOCK WORK

Squamish Fire Hall Valleycliff

Block Work

Scope of Work

MAPLE LEAF STORAGE

BLOCK WORK
CMU elevator shaft and fire-rated partition walls in a new storage facility.
Scope of work
This project involved CMU.

POCKIT STORAGE

BLOCK WORK
This is a new storage facility in Vancouver. Concrete masonry units were installed throughout the parkade.
Scope of Work

ODYSSEY

BLOCK WORK
Various fire-rated partition walls in a two mid-rise building project in Saanich.
Scope of work
Fire rated CMU walls throughout the project.

Canada Pacific Diesel Shop
1670 Lougheed Highway, Port Coquitlam, BC
Block Work
A new diesel shop for CP Rail, composed of CMU and structural steel. Universal Masonry was contracted to build CMU fire-rated walls and veneer walls.
Scope of Work
This project involved seismic ties, brick veneer, and CMU.
VALLEYVIEW SECONDARY SCHOOL
Block Work
A 2-storey addition to Valleyview Secondary School will increase the school’s capacity by 400 students. Universal Masonry completed the brick cladding and a firewall separating the existing school from the addition.
Scope of work
The project involved FERO FAST Brackets, Shelf angle, envelope, seismic ties, insulation, brick veneer, and CMU.